What can change the scope for tiling work in Logan
For Logan homes, tiling quotes should describe how the existing slab or sheet floor will be made ready, how the family can use the house during staged work and who is responsible for waterproofing. Large living areas and patios particularly need deliberate set-out and joint planning.
Large connected floor areas
In an open living, kitchen and hallway layout, establish the main tile line and where cuts land before work starts. Existing slab joints, room transitions and any staged access route should be reflected in the layout and movement-joint proposal.
Cracks beneath old finishes
Ask what slab-crack inspection and preparation are included after demolition. The tiler should distinguish stable surface defects from movement that needs further assessment, rather than covering every crack under an unspecified membrane.
Occupied-home sequencing
Families may need continued access to bedrooms, a bathroom or external doors. Agree the work zones, curing periods, cutting location and daily clean-up so the programme is realistic and noisy tasks remain within local requirements.
